Organize Sanayi Bölgesi 27. Cadde No:10 Eskişehir / Türkiye
TR | EN | DE | RU

Local Control Panel

Local Control Panel

Product Details

Local control panel for Full-Height Platform Screen Door Systems.
  • Category: AUTOMATION

The Full-Height Platform Screen Door System serving 2 stations and 4 platforms on the "Havaray line" — Türkiye's first private monorail line, connecting Seyrantepe Metro Station with Vadistanbul — was put into service in 2017.

Our ALPSD-1000 Platform Screen Door System, the first domestically developed full-height PSD, also holds Türkiye's first SIL3 safety integrity level certificate.